| 21 November 2010 The engine's cab has been brought into the Shed and placed on blocks temporarily prior to fitting to the chassis. The control levers have been fixed to a new floor with rodding in place to the gearbox. |

| Before. Engine, Gearbox and Radiator all refurbished and in place. |

| Brian, Dave, John and Bill (hiding) are clearing the stuff that had accumulated in the cab! |

| Cab in its temporary position on blocks. You can see previous reports HERE (March 2008) HERE (January 2008) and HERE (January 2007). |
| BACK |